Start my SWMS →Common carpentry tasks that need a SWMS
- Wall and roof framing
- Installing trusses and beams
- Structural alterations with temporary propping
- Decks, pergolas and stairs at height
High risk construction work categories that usually apply
- Risk of a person falling more than 2 metres
- Temporary load-bearing support for structural alterations or repairs
- Work in an area at a workplace where there is any movement of powered mobile plant
Key hazards and example controls
| Hazard | Risk | Example controls |
|---|---|---|
| Working at height on roofs, edges, scaffolds or ladders | Fall from height causing serious injury or death | Eliminate where possible by doing work at ground level (pre-fabricate). Install edge protection / guardrails before work starts. Use scaffold or EWP in preference to ladders. Where a fall-prevention device isn't practicable, use a fall-arrest system with anchor points certified and a rescue plan in place. Ladders only for short-duration light work, on firm level ground, secured, 3 points of contact. |
| Fragile roofing, skylights and penetrations | Falling through brittle surfaces | Identify and mark fragile surfaces. Install safety mesh or covers rated for the load. Exclusion zones under work area. Walkways/crawl boards on fragile roofs. |
| Falling objects from height | Workers or public struck by tools/materials | Toe boards and debris netting. Tool lanyards. Exclusion zone with barricades and signage below. Hard hats in the zone. |
| Inadequate propping or temporary support | Structural collapse, crush injury | Engineer-designed propping. Install and remove props in the specified sequence. Inspect props before each shift and after any impact. No loading beyond design. |
| Mobile plant moving near workers | Struck by or crushed by plant | Traffic management / exclusion zones separating people and plant. Spotters. Reversing alarms and beacons. Licensed operators. Pre-start checks. Hi-vis clothing. |
Example controls are a starting point only — tailor them to your site, your plant and the way you'll actually do the job.
Other site hazards worth including
- Manual handling of materials and tools — Mechanical aids (trolleys, hoists). Team lifts for heavy items. Plan the job to minimise carrying. Store materials at working height.
- Hand and power tools — Guards in place. Tools inspected and tagged. Trained users only. Eye protection and gloves as appropriate.
What your SWMS has to cover
- Which high risk construction work the job involves.
- The hazards and the risks to health and safety from them.
- The control measures, and how they'll be implemented, monitored and reviewed — e.g. who installs and who checks the edge protection.
- It should be specific to the site and available to the workers and supervisors doing the job.
- If work isn't being done in line with the SWMS, it must stop (immediately or as soon as it's safe).
- Review and revise it whenever the control measures change.
Based on Safe Work Australia, SafeWork NSW and WorkSafe Queensland guidance. Victoria applies its own OHS Regulations — check WorkSafe Victoria.
Common questions
Do carpenters & builders need a SWMS?
Whenever the job involves high risk construction work — for carpentry that commonly means working at heights, structural alterations & propping, mobile plant. Many principal contractors also require one before you start on site.
How long does it take to make one?
With SWMS Ready, around 10 minutes: tick the high risk work, tailor the pre-filled hazards and controls, add site and emergency details, then print with a sign-on sheet.
Can I reuse my SWMS on the next job?
Review it for every site. The hazards, controls, people and emergency arrangements need to match the actual job.
Done before smoko
Site-specific SWMS with hazards, controls, PPE, emergency details, sign-on sheet and review log — A$49 per SWMS, free to preview.
Build my SWMS