SWMS guide · updated November 2026
SWMS for concreters
Concreting sites usually involve moving powered mobile plant, often deep footings or trenches, and sometimes tilt-up or precast panels — all high risk construction work.
Build this SWMS now
Pre-filled with the hazards below. Add your site details, tailor the controls, print with a worker sign-on sheet.
Start my SWMS →Common concreting tasks that need a SWMS
- Slabs and footings
- Concrete pumping with mobile plant on site
- Tilt-up and precast panel installation
- Cutting and grinding concrete
High risk construction work categories that usually apply
- Work in an area at a workplace where there is any movement of powered mobile plant
- Work in or near a shaft or trench deeper than 1.5 m, or a tunnel
- Work involving tilt-up or precast concrete elements
Key hazards and example controls
| Hazard | Risk | Example controls |
|---|---|---|
| Mobile plant moving near workers | Struck by or crushed by plant | Traffic management / exclusion zones separating people and plant. Spotters. Reversing alarms and beacons. Licensed operators. Pre-start checks. Hi-vis clothing. |
| Trench wall collapse | Burial, crush injury, death | Shoring, benching or battering per engineer/competent person. Keep spoil and plant back from the edge. Inspect trench daily and after rain. Safe access/egress ladder within reach. |
| Contact with underground services | Electrocution, gas release | Before You Dig Australia enquiry. Locate and mark services. Hand/vacuum excavate near services. |
| Lifting and placing precast panels | Panel collapse or drop, crush injury | Engineer-approved erection design and bracing. Crane lift plan. Licensed dogman/rigger. Exclusion zone during lifts. Check lifting inserts before lifting. |
Example controls are a starting point only — tailor them to your site, your plant and the way you'll actually do the job.
Other site hazards worth including
- Silica dust from cutting, grinding or drilling — Wet cutting or on-tool extraction (H-class vacuum). P2 RPE minimum. No dry sweeping. Health monitoring as required.
- Manual handling of materials and tools — Mechanical aids (trolleys, hoists). Team lifts for heavy items. Plan the job to minimise carrying. Store materials at working height.
What your SWMS has to cover
- Which high risk construction work the job involves.
- The hazards and the risks to health and safety from them.
- The control measures, and how they'll be implemented, monitored and reviewed — e.g. who installs and who checks the edge protection.
- It should be specific to the site and available to the workers and supervisors doing the job.
- If work isn't being done in line with the SWMS, it must stop (immediately or as soon as it's safe).
- Review and revise it whenever the control measures change.
Based on Safe Work Australia, SafeWork NSW and WorkSafe Queensland guidance. Victoria applies its own OHS Regulations — check WorkSafe Victoria.
Common questions
Do concreters need a SWMS?
Whenever the job involves high risk construction work — for concreting that commonly means mobile plant, trenching & excavation, tilt-up & precast concrete. Many principal contractors also require one before you start on site.
How long does it take to make one?
With SWMS Ready, around 10 minutes: tick the high risk work, tailor the pre-filled hazards and controls, add site and emergency details, then print with a sign-on sheet.
Can I reuse my SWMS on the next job?
Review it for every site. The hazards, controls, people and emergency arrangements need to match the actual job.
Done before smoko
Site-specific SWMS with hazards, controls, PPE, emergency details, sign-on sheet and review log — A$49 per SWMS, free to preview.
Build my SWMS