SWMS guide · updated November 2026

SWMS for electricians

Most electrical jobs on a construction site tick at least one high risk box: work on or near energised installations, and often a fall risk over 2 metres from ladders, EWPs or roof spaces.

Build this SWMS now

Pre-filled with the hazards below. Add your site details, tailor the controls, print with a worker sign-on sheet.

Start my SWMS →

Common electrical tasks that need a SWMS

  • Switchboard installation and upgrades
  • Running cable through ceiling spaces and risers
  • Installing lights, fans and data points at height
  • Fault finding near energised equipment
  • Working near overhead power lines

High risk construction work categories that usually apply

Key hazards and example controls

HazardRiskExample controls
Contact with live electrical partsElectric shock, arc flash, burns, deathDe-energise, isolate, lock-out/tag-out and test before touching. Live work only where permitted and by licensed electricians with a safety observer. Insulated tools and arc-rated PPE. RCD protection on all portable equipment.
Overhead power lines near plant or laddersElectrocutionMaintain approach distances set by the network operator / regulator. Spotter for plant near lines. Use non-conductive ladders.
Working at height on roofs, edges, scaffolds or laddersFall from height causing serious injury or deathEliminate where possible by doing work at ground level (pre-fabricate). Install edge protection / guardrails before work starts. Use scaffold or EWP in preference to ladders. Where a fall-prevention device isn't practicable, use a fall-arrest system with anchor points certified and a rescue plan in place. Ladders only for short-duration light work, on firm level ground, secured, 3 points of contact.
Fragile roofing, skylights and penetrationsFalling through brittle surfacesIdentify and mark fragile surfaces. Install safety mesh or covers rated for the load. Exclusion zones under work area. Walkways/crawl boards on fragile roofs.
Falling objects from heightWorkers or public struck by tools/materialsToe boards and debris netting. Tool lanyards. Exclusion zone with barricades and signage below. Hard hats in the zone.

Example controls are a starting point only — tailor them to your site, your plant and the way you'll actually do the job.

Other site hazards worth including

  • Slips, trips and falls on the same level — Housekeeping: keep walkways clear, manage leads and hoses, clean up spills. Adequate lighting.
  • Hand and power tools — Guards in place. Tools inspected and tagged. Trained users only. Eye protection and gloves as appropriate.

What your SWMS has to cover

  • Which high risk construction work the job involves.
  • The hazards and the risks to health and safety from them.
  • The control measures, and how they'll be implemented, monitored and reviewed — e.g. who installs and who checks the edge protection.
  • It should be specific to the site and available to the workers and supervisors doing the job.
  • If work isn't being done in line with the SWMS, it must stop (immediately or as soon as it's safe).
  • Review and revise it whenever the control measures change.

Based on Safe Work Australia, SafeWork NSW and WorkSafe Queensland guidance. Victoria applies its own OHS Regulations — check WorkSafe Victoria.

Common questions

Do electricians need a SWMS?

Whenever the job involves high risk construction work — for electrical that commonly means electrical work near live parts, working at heights. Many principal contractors also require one before you start on site.

How long does it take to make one?

With SWMS Ready, around 10 minutes: tick the high risk work, tailor the pre-filled hazards and controls, add site and emergency details, then print with a sign-on sheet.

Can I reuse my SWMS on the next job?

Review it for every site. The hazards, controls, people and emergency arrangements need to match the actual job.