SWMS for landscapers
Landscaping becomes high risk construction work when there's powered mobile plant moving on site or trenches deeper than 1.5 metres.
Build this SWMS now
Pre-filled with the hazards below. Add your site details, tailor the controls, print with a worker sign-on sheet.
Start my SWMS →Common landscaping tasks that need a SWMS
- Excavation and retaining walls
- Operating bobcats and excavators
- Irrigation trenching
- Paving and stone cutting
High risk construction work categories that usually apply
- Work in an area at a workplace where there is any movement of powered mobile plant
- Work in or near a shaft or trench deeper than 1.5 m, or a tunnel
Key hazards and example controls
| Hazard | Risk | Example controls |
|---|---|---|
| Mobile plant moving near workers | Struck by or crushed by plant | Traffic management / exclusion zones separating people and plant. Spotters. Reversing alarms and beacons. Licensed operators. Pre-start checks. Hi-vis clothing. |
| Trench wall collapse | Burial, crush injury, death | Shoring, benching or battering per engineer/competent person. Keep spoil and plant back from the edge. Inspect trench daily and after rain. Safe access/egress ladder within reach. |
| Contact with underground services | Electrocution, gas release | Before You Dig Australia enquiry. Locate and mark services. Hand/vacuum excavate near services. |
Example controls are a starting point only — tailor them to your site, your plant and the way you'll actually do the job.
Other site hazards worth including
- Manual handling of materials and tools — Mechanical aids (trolleys, hoists). Team lifts for heavy items. Plan the job to minimise carrying. Store materials at working height.
- Working in heat and sun — Schedule heavy work for cooler times. Water, shade and rest breaks. Sun protection (hat, long sleeves, sunscreen).
What your SWMS has to cover
- Which high risk construction work the job involves.
- The hazards and the risks to health and safety from them.
- The control measures, and how they'll be implemented, monitored and reviewed — e.g. who installs and who checks the edge protection.
- It should be specific to the site and available to the workers and supervisors doing the job.
- If work isn't being done in line with the SWMS, it must stop (immediately or as soon as it's safe).
- Review and revise it whenever the control measures change.
Based on Safe Work Australia, SafeWork NSW and WorkSafe Queensland guidance. Victoria applies its own OHS Regulations — check WorkSafe Victoria.
Common questions
Do landscapers need a SWMS?
Whenever the job involves high risk construction work — for landscaping that commonly means mobile plant, trenching & excavation. Many principal contractors also require one before you start on site.
How long does it take to make one?
With SWMS Ready, around 10 minutes: tick the high risk work, tailor the pre-filled hazards and controls, add site and emergency details, then print with a sign-on sheet.
Can I reuse my SWMS on the next job?
Review it for every site. The hazards, controls, people and emergency arrangements need to match the actual job.
Done before smoko
Site-specific SWMS with hazards, controls, PPE, emergency details, sign-on sheet and review log — A$49 per SWMS, free to preview.