SWMS for chemical, fuel & refrigerant lines
A safe work method statement is required before work on or near chemical, fuel or refrigerant lines — that's one of the 18 categories of high risk construction work. Here's what it needs to cover and the hazards to plan for.
Build this SWMS now
Pre-filled with the hazards below. Add your site details, tailor the controls, print with a worker sign-on sheet.
Start my SWMS →Key hazards and example controls
| Hazard | Risk | Example controls |
|---|---|---|
| Release from chemical, fuel or refrigerant lines | Burns, toxic exposure, fire | Identify and isolate lines with the owner. Lock-out/tag-out. Check SDS for each substance. Appropriate PPE (gloves, eye protection, RPE). Spill kit on site. |
Example controls are a starting point only — tailor them to your site, your plant and the way you'll actually do the job.
Often combined with
What your SWMS has to cover
- Which high risk construction work the job involves.
- The hazards and the risks to health and safety from them.
- The control measures, and how they'll be implemented, monitored and reviewed — e.g. who installs and who checks the edge protection.
- It should be specific to the site and available to the workers and supervisors doing the job.
- If work isn't being done in line with the SWMS, it must stop (immediately or as soon as it's safe).
- Review and revise it whenever the control measures change.
Based on Safe Work Australia, SafeWork NSW and WorkSafe Queensland guidance. Victoria applies its own OHS Regulations — check WorkSafe Victoria.
Common questions
Do I need a SWMS for chemical, fuel & refrigerant lines?
Yes, if the job involves work on or near chemical, fuel or refrigerant lines. That is listed as high risk construction work, and a SWMS must be prepared before the work starts.
Can I use a generic SWMS?
A SWMS should be specific to the site and the way the work will actually be done. A template is a useful starting point, but tailor the hazards, controls, people and emergency details to each job.
Who prepares the SWMS?
The business (PCBU) carrying out the high risk construction work, in consultation with the workers who will do it.
Done before smoko
Site-specific SWMS with hazards, controls, PPE, emergency details, sign-on sheet and review log — A$49 per SWMS, free to preview.